In Ground Basketball Systems
Basketball Hoop Assembly & Installation
Get a free quote
Information we need from you before installing in-ground Basketball
- MegaSlam
- Goalsetter
- ProDunk
- Goaliath
- Goalrilla
- Silverback
- American Eagle
- First Team
- Lifetime
- Ironclad
- Spalding
Homeowner’s preparation for the installation of in-ground basketball system
~FAQs about Canceling and Rescheduling~
Can I cancel or reschedule my service visit?
You are free to do so but you will have to give us a call 24 hours before our scheduled visit. To cancel your scheduled visit, it is important you give us a call 24 hours ahead of time. Failure to do so will attract a 2nd trip fee on your next appointment.
Can you explain what you mean by in-ground basketball goal installation?
This installation is done in 2 days. Though there might be some variations, the installation is generally done as follows:
Visit 1: Prepare a hole, 36 to 48” deep and 18 to 24” wide. Get the hole filled with concrete and install the manufacturer’s anchor system.
Visit 2: We will then mount a backboard system and a pole.
We will require you pen down your signature once the installation has been completed. We ask that you wait for 24 hours before making use of your system.
Cost of installation is calculated based on the cost of the concrete and the size of the goal.
Why is it necessary to have my property marked?
State laws demand your property first be marked before any hole can be dug. However, requirements for marking varies state to state.
Do is still have to mark my property after signing the waiver?
The waiver covers only underground objects located within your property such as security fences. The law demands public utilities be marked by state authorities.
How close will your dig be to the marking?
Digging can only be made, at minimum, 36 inches away from the marking.
Will you have to make new markings when installing new in-ground basketball hoop?
We will still have to have your property marked, as we can’t accurately determine if the previous installer had marked your property appropriately. Marking your property also ensures we stay within safety limits especially when using heavy machinery such as a jackhammer. But if we were the ones that did the previous installation, then there will be no need for marking provided we are installing a new hoop of exact size as the former.
What will I have to do?
We advise you read between the lines of your waiver before penning down your signature. You will be held responsible should any underground utility be damaged during digging. The client or their representative of at least 18 years of age must be present on both visits.
It is your duty to provide water source which should be 150 feet from the dig site. We will need this for concrete mixing.
Also ensure nobody comes close to the anchor kit or pole after performing the first phase of the basketball unit installation.
If after signing the waiver I change my mind about the job, can I rescind it?
Not immediately. You will have to give your consent online and then have the signed copy faxed to us. We are more than happy to walk you through the entire process.
~About Installation~
- MegaSlam
- Goalsetter
- ProDunk
- Goaliath
- Goalrilla
- Silverback
- American Eagle
- First Team
- Lifetime
- Ironclad
- Spalding
~Professional Basketball Hoop Installation in Maryland, District of Columbia, Northern Virginia and Southern Pennsylvania~
- Shaking/Lose Backboard
- Problems with the hardware
- Shaking concrete due to improper curing
- Wobbling arms and pole
- Slanted basketball hoop
To Ease Your Move Or Redecorate Your Home Space
Follow a Few Easy Steps
Tells us your needs
Please fill up the contact form and provide us with as many details of your project as possible.
Approve Estimate
Our experts will review your project needs and create a plan that works with your schedule. You will then have to review & approve the plan via email.
Project Kick-Off
Once you have approved our solution plan, we'll send professional installers who own just the right tools & equipment in their arsenal to complete your project.
Customer Service 24/7
We’d love to hear from you. Choose the most convenient method and we’ll get back to you as soon as we can.
Contact Us
In Ground Basketball Systems near me
Service across Maryland, Pennsylvania, Washington DC, and Northern Virginia.
VA
Any Assembly Virginia
+1(703) 596-0086
DC
Any Assembly Washington
+1(202) 684-6782
PA
Any Assembly Pennsylvania 
+1(267) 209-0710
Frequently Asked Questions
How much does it cost to install a basketball hoop in the ground?
The cost varies based on the basketball system type, concrete needed, and any additional services. Contact Any Assembly for a specific quote.
How do you install a basketball hoop in the ground?
The installation process involves two visits:
- Visit 1: Digging a hole 36-48” deep and 18-24” wide, pouring concrete, and installing the anchor system.
- Visit 2: Mounting the backboard and pole. The entire process ensures a sturdy and safe installation.
Can in-ground basketball hoops be moved?
Yes, but it involves disassembling the hoop, digging out the base, and reinstalling it at the new location. This process should be done by professionals to avoid damage.
How deep should an in-ground basketball hoop be?
The hole should be dug 36-48” deep to ensure the stability of the basketball hoop.
How much concrete is needed to install a basketball hoop?
The amount of concrete depends on the size of the hole and the specific requirements of the basketball system being installed. Generally, about 6-8 bags of concrete mix are used.
Can you install a basketball hoop on existing concrete?
Yes, but it requires specialized installation methods, such as using anchors and bolts to secure the system to the existing concrete surface.
Can I put a basketball hoop in my driveway?
Yes, a driveway is a common location for installing a basketball hoop. Ensure there is enough space and that the installation complies with local regulations.
What weather conditions are ideal for installing a basketball hoop?
Installation is ideal when daytime temperatures are around 85 degrees Fahrenheit, with nighttime temperatures at least 70 degrees. Installations will be postponed if the temperature falls below freezing or if it rains four hours before the concrete is poured.
How long does the entire installation process take?
The process generally takes 3-4 days to schedule the utility markings, plus additional time for the concrete to set and the hoop to be installed. The exact duration depends on weather conditions and site-specific factors.
What preparation is needed before the installation?
- Clearance: Obtain clearance from your local utility company.
- Marking: Have utility lines marked on your property.
- Site Preparation: Ensure the installation area is clear of obstacles like lawn lighting systems and sprinklers.
What is the depth of the hole for installation?
The hole should be 18” by 18” wide and 3-4 feet deep to ensure stability.
What happens to the excavated dirt?
The dirt will be moved to a designated spot on your property. We do not haul dirt away from the site.
Why am I required to be at home during the two visits?
Your presence ensures the correct location for installation and confirms your satisfaction with the completed work. It also allows you to address any immediate concerns with the technicians.
What if my previously installed hoop is still functional?
We can remove the existing hoop at an additional cost. You will be responsible for its disposal.
What are common causes of damage to a basketball hoop?
Avoid dunking and hanging on the rim, as this can compromise the integrity of the hoop. Regular maintenance is recommended to keep the hoop in good condition.
What does your warranty cover?
Our warranty covers the installation process, with a six-month warranty for the base and a 90-day warranty for parts above ground. Product warranties vary by manufacturer.
Do I need maintenance for my basketball hoop?
Yes, regular maintenance ensures the longevity and safety of your basketball hoop. We offer free maintenance services when needed.